Aluminum Alloy Window Panel
  • Aluminum Alloy Window PanelAluminum Alloy Window Panel

Aluminum Alloy Window Panel

    This page is for raised access floor projects that need a window panel for inspecting and monitoring underfloor services without lifting every blind panel. Huahong’s Aluminum Alloy Window Panel is processed from a blind panel and can be interchanged with blind panels in the same floor system. The window quantity and size can be customized, with single-window, double-window and four-window configurations available, and the window uses high-strength acrylic that can withstand static and dynamic loads. The AL500 model provides a concentrated load of 500 kgf/6.45 cm² with deflection of 2.0 mm or less and a uniformly distributed load of 500 kgf/m² with deflection of 1.0 mm or less. Send the required window configuration, window size, panel quantity, load requirement and destination port for a project-specific quotation within 24 hours.

    Send Inquiry

    Rating: 5.0
    (Rating Count: 1)
    Product Description

    Product Introduction

    Aluminum Alloy Window Panel is processed on the basis of blind panels, and can be interchanged with blind panels for easy inspection and monitoring of the situation under the floor. We can customize window sizes and quantities according to project requirements, including single window panels, double window panels, and four window panels. The window material is high-strength acrylic, which can withstand heavy static and dynamic loads.

    Product Specifications

    model Concentrated load(deflection≤2.0mm) ultimate load uniformly distributed load(deflection≤1.0mm) Rolling load
    AL500 500kgf/6.45cm² / 500kgf/m² /


    Suggestions for the Use and Maintenance

    Cleanliness requirements for the venue

    Due to strict cleanliness control requirements during the construction of the purification workshop, in order to avoid the omission and residue of dust particles, which may affect the future use of the purification workshop, all floors in the factory must be washed clean with an air compressor first, and then packaged in plastic bags before being transported into the workplace. Construction personnel must change into specialized work clothes, work shoes, hats, and gloves for the purification workshop before entering the site. Floor cutting must have a separate room to ensure a clean and safe working environment.


    Equipment installation requirements

    When the equipment is directly placed on the aluminum alloy floor, a stainless steel plate with a size of 150 * 150 mm or larger and a thickness of 5mm~10mm must be used to pad the foot of the equipment and expand the contact surface with the floor. When the equipment is heavy or has anti vibration requirements, it is usually necessary to build an independent foundation (steel platform or poured concrete platform) for the equipment, and the floor installation should be separated from the equipment platform.


    Equipment handling requirements

    Plan the equipment transportation route in advance and designate the area as the equipment transportation channel. The floor surface at the transportation channel must be protected with 3mm-5mm stainless steel plates. When moving and transporting equipment on the floor, it is strictly prohibited for the equipment to roll and roll directly on the floor. Hydraulic vehicles with larger wheel diameters should be selected as transportation tools as much as possible. In transportation engineering, strive to move equipment at a constant speed to avoid impact on the floor.

    Related Category
    Send Inquiry
    Please Feel free to give your inquiry in the form below. We will reply you in 24 hours.
    Rating:
    5.0
    X
    We use cookies to offer you a better browsing experience, analyze site traffic and personalize content. By using this site, you agree to our use of cookies. Privacy Policy
    Reject Accept